D8259AC-2 ,Programmable Interrupt Controller - DIP-28 Package

SKU
SCIx0810
Brand
Part Number
D8259AC-2
short Description
Out Of Stock
Add to Wish List

Notify me when this product is available:

Guarantee safe & secure checkout

The D8259AC-2 is a programmable interrupt controller (PIC) from NEC, designed to enhance the interrupt-handling capabilities of microprocessors by providing a prioritized interrupt environment. It is commonly used in computer systems to manage multiple interrupt requests and provide a more efficient and organized approach to handling interrupts.

This controller is compatible with Intel microprocessors and can be cascaded to accommodate up to 64 interrupt requests. Housed in a 28-pin DIP (Dual In-line Package), it is suitable for through-hole mounting on PCBs, making it ideal for embedded systems, industrial controls, and computer hardware applications that require efficient interrupt management.

Key Features:
  • Programmable Interrupt Prioritization: Supports up to 8 priority levels, allowing flexible interrupt management based on application needs.
  • Cascading Capability: Supports cascading of multiple 8259A controllers, enabling management of up to 64 interrupt lines.
  • Compatibility: Designed to be compatible with Intel microprocessors, providing seamless integration with various CPUs.
  • Edge and Level Triggered Modes: Configurable for edge-triggered or level-triggered interrupts, making it versatile for various applications.
  • Low Power Consumption: Optimized for low power consumption, suitable for energy-efficient embedded systems.
  • DIP-28 Package: Comes in a 28-pin DIP package, ideal for prototyping and easy integration with standard breadboards and through-hole PCB designs.
More Information
Brand Besomi
GTIN 6294021108515
Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account
 

Stock

Shipping Method

ETA

Cost

Available

Self Pickup

1-2 Day

Free

Available

Inside Jordan

1 - 3 Days

3 JOD / Free Above 100 JOD

pre-order

General

3-5 Weeks